Friday, June 8, 2012

PHASE I, II, & III

PHASE I
DEMOLITION
The addition is coming right along. The kitchen/dining area have been demo-ed. 
This exterior wall of windows has been completely torn down to create an 
opening to the addition. This addition will create a space of 
26 x 16 with 14 foot vaulted ceilings.
It will include no middle wall to 
create a family room off the kitchen to make one BIG great room!
(To the left of this picture is the eat-in kitchen area. The fireplace
will be moved to the great room.)



PHASE II
FRAMING EXTERIORS WALLS & NEW ROOF
The exterior started with framing the walls and a new roof. The roof 
looks amazing - if you need a good roofer - I know a GrEaT one! ;-)
Two doors will give you exterior access on each side of the addition to one smaller 
deck on the left to over look the play area and one LARGE deck to the right
that will come clear across to the master bedroom. It will have 
 stairway access to the lower patio/fire pit area outside the 
basement addition - aka Daddy's Cave.  



The bottom level is the Daddy Cave (basement). There are two doors on the outer walls and 
a big bay window in the center wall with smaller windows on either side of the bay. 


PHASE III
INTERIOR FRAMING

 Macka & Daddy are cooking up something yummy in the kitchen! 
To their left is the mudroom & half bath. 


This a view from the kitchen into the family room looking left.




PHASE IV 
THE INTERIOR GUTS - ELECTRICAL, PLUMBING, & HVAC

This is another view straight-on from the kitchen into the family room. 
Progress is being made. All electrical is wired, plumbing added/relocated and HVAC 
is being ducted (is that a verb?). 


The upstairs is getting finished with her facelift. Painting is complete, vanities are being 
stained, fixtures replaced, tile laid & faucets being installed. 






More pictures to come of Daddy's Cave & deck/landscaping progress in the next post. 



No comments: